State Road 25 will be reduced to one lane at Keren Neff Ditch between C.R. 875 N and C.R. 950 N on or after Monday, April 14 through mid-May, with traffic controlled by temporary traffic signals.
Crews will be conducting a small structure pipe lining project.
INDOT urges drivers to stay alert near crews and be prepared to wait for the temporary traffic signal.
Silver Alert: Kipton (Kip) Harris, 16, of Rochester
Silver Alert for Rochester Teen
First Federal Savings Bank named a Five Star Member of the IBA
IDEM introduces new “Local Air Quality Advisory” for short‑term conditions
Indiana Governor Mike Braun extends suspension of gas tax
Letter Carriers' Food Drive this Saturday
Pulaski County Tribe 'Art in the Park' event this Saturday in Winamac
Cops Cycling for Survivors to honor more than 300 Indiana officers during 25th annual ride
